CAT / CAS / ENG / FRA   

Fields of Application / Civil engineering

Catalunya. Toyser was commissioned to use a precision measuring trolley to scan a total of 11 railway tunnels on the Zaragoza – Barcelona conventional track with an overall length of 5,600 metres.

 

Toyser provided the technical equipment required for these measurements: an Amberg GRP 5000 railway track trolley with an HDS 6200 scanner and a Leica TS30 total station with 0.5" angular accuracy and 0.6 mm in distance. The work speed was 0.9 km/hour in order to record a point density of 5 x 5 mm.

Customer

  • AMBERG INFRAESTRUCTURAS, S.A.

Category

  • Services
  • Laser scanning
  • Aplication Field
  • Civil engineering

Date

  • 25/07/2012

Related links

Related projects